CR Visual Production Manager

CR Visual Production Manager

Test

https://help.crautoscheduler.com/portal/en/kb/articles/visual-production-manager-card-guide

    • Related Articles

    • Visual Production Manager: Control Charts Overview

      This tutorial covers the four control charts seen in the VPM. ***The arrow on top of the chart is the goal. The arrow on the chart is the current progress towards that goal. The colors are an easy way to see how you're doing (green = on target, ...
    • Visual Production Manager-Lite : Card Guide

      This tutorial will be covering the main features of the cards are in the VPM. 1. Edit Repair Record (top left) A. Clicking this button gives you general information (RO & Unit number, owner name/contact info., insurance (if there is any), what repair ...
    • Visual Production Manager (VPM-Lite): Shop Settings Guide

      This tutorial covers all the tools and features of the shop settings tab. 1. Go to the top right corner of the page, and click on the three dots. Then, click shop options. 2. The section titled 'edit repair hours' add a new size category to jobs you ...
    • VPM Post-Install Training Index

      This article is an index of tutorials that will be helpful with familiarizing yourself with the Visual Production Manager. 1. Shop Options (click the menu button in the upper right corner, then select "Shop Options") A. Allows you to change default ...
    • Setting a vehicle to a Totaled Status

      To set a repair to a Totaled Status, click on the expected out date. Click on “Cancel” Click on Set Totaled This will move the card to the column marked as “Actual Out Date” and remove the hours from WIP and replace the hours with a “T” to show that ...